
![]()
![]()

Installing dedicated groundwater monitoring pumps provide for the most simple installation. Here's how it works -
You provide us with the hose lengths and we assemble the hose with integrated power wire to length, install stainless steel quick connect couplings and watertight electrical plugs and install the well cap on the upper end of the hose (specify 2" or 4" well cap / and schedule 40 or 80 well casing). The pump simply snaps onto the well cap & hose assembly and are lowered down onto the well casing.
By dedicating a pump / hose / well cap to each well, field personnel will only need to transport our briefcase controller and a power source to the site to draw a sample. While the initial installation cost will be somewhat higher (we offer a discount on 6+ pumps), long term monitoring projects are more economical by eliminating the man hours spent to decon equipment. Samples attained may be more accurate due to eliminating the chance of cross contamination.

